保定润涂装饰工程有限公司

保定环氧地坪含油基面怎样解决?

信息来源:www.dpgc1688.com   2019-08-12 17:12:00

保定环氧地坪漆含油地面的处理步骤地坪漆是现阶段工业行业中运用的广泛的产品之一,虽然地坪漆的施工工艺看似简单,但其实,它对于施工的要求却是相当高的,在地坪进行施工时往往容易产生质量的问题。

Baoding epoxy floor paint is one of the most widely used products in the industrial industry at present. Although the construction technology of floor paint seems simple, in fact, its requirements for construction are quite high. It is easy to produce quality problems in the construction of the floor.

含油地面的处理步骤:

Processing steps of oily ground:

清理地面.在施工前要对地面进行处理,清除杂质.并且对旧地面的机器设备做好保护工作。油污清除.在有油污的地方可以采用人工清除,或者使用对明显的油污进行烧除。盐酸冲洗.主要起到一个除油的作用。

Clean up the ground. Before construction, the ground should be treated to remove impurities. And the old ground machinery and equipment to do a good job of protection. Oil contamination removal. Where there is oil contamination, manual removal can be used, or the obvious oil contamination can be burned with a gun. Flushing with hydrochloric acid plays an important role in oil removal.

盐酸的浓度不能太高,用到4~5%即可.对于油污较重的地方,可以多推几次.使用这个方法要注意安全通风,如果不小心被盐酸溅到,需要用大量的水冲洗碱洗地面.使用一公斤的烧碱与20公斤的水混合,刮涂地面,目的是为了中和地面的盐酸,但是,盐酸的量不能大于碱洗,因为环氧地坪耐酸不耐碱

The concentration of hydrochloric acid should not be too high, it can be used to 4-5%. For places with heavy oil pollution, it can be pushed several times. When using this method, we should pay attention to safety and ventilation. If it is accidentally spilled by hydrochloric acid, we need to wash the ground with a large amount of water. We use a kilogram of caustic soda mixed with 20 kilograms of water to scrape the ground for the purpose of neutralizing the salt on the ground. Acid, however, the amount of hydrochloric acid should not be greater than alkali washing, because the epoxy flooring is acid-resistant and alkali-resistant.

打磨处理.使用打磨机将地面被腐蚀的水泥和油污打磨掉,然后用大量的水冲洗地面。干燥处理.如果通风较好的话地面一般两天就可以干了,等待干燥后就可以进行环氧地面施工,不好的情况就要一周,可以使用空调或抽湿机处理

Grinding treatment. Use a grinder to grind the ground with corroded cement and oil, and then wash the ground with a lot of water. Drying treatment. If the ventilation is good, the ground can generally dry in two days. After waiting for drying, the epoxy ground construction can be carried out. If the bad situation is about a week, air conditioning or dehumidifier can be used to deal with it.